II. Number and type of apartments booked ( July to September, 2023 )
Building Name : Udhyan Apartment
Apartment Type
Block Number
Carpet Area (Excluding balcony / Verandah / terrace) (In sq. meters)
Area of Exclusive Balcony and Verandah
Total Number of Sanctioned Apartments
Number of Apartments booked/ sold/ allotted at the time of registration or by the end of last quarter
Cumulative Number of Apartments booked/ sold/ allotted by the end of the current quarter
3 BHK (HIG)
Block O
107.05
12.80
36
0
3 BHK (HIG)
Block P
107.05
12.80
36
0
3 BHK (HIG)
Block Q
107.05
12.80
36
0
3 BHK (HIG)
Block R
107.05
12.80
36
0
3 BHK (HIG)
Block S
107.05
12.80
36
0
3 BHK (MIG-B)
Block L
84.83
10.89
36
0
3 BHK (MIG-B)
Block M
84.83
10.89
36
0
3 BHK (MIG-B)
Block N
84.83
10.86
36
0
Total
288
0
0
III. Number of parkings allotted
Type
Total No. of Car parking
Total No. of Two Wheeler parking
Total No. of cycle parking
Total No of Mechanical Car Parking
Total No. of parking allocated at the time of registration or by the end of last quarter
Cumulative No. of parking allocated by the end of current quarter
Location
Car
Two Wheelers
Car
Two Wheelers
Open Area
Stilt Floor
Basement
Any Other Floor
Total
IV. Status of the Project Construction/Development
Part 1: Architectural Progress as per Form R1 issued as at the end of current Quarter ( July to September, 2023 )
TABLE - A
Building Name: Udhyan Apartment
S.No.
Task/Activity
Percentage of work done
In Last Quarter
In Current Quarter
1
Excavation
0
0.00
2
1
Number of Basement(s) and Plinth
0
0.00
3
1
Number of Stilt Floor
0
0.00
4
9
Number of Slabs of Super Structure
0
0.00
5
Internal walls,Internal Plaster,Floorings with in Flats/Premises,Doors and Windows to each of the Flat/Permises
0
0.00
6
Sanitary Fittings with in the Flat/Presmises,Electrical Fittings with in the Flat/Presmises
0
0.00
7
Staircases, Lifts wells and Lobbies at each Floor level connecting Staircases and Lifts,Overhead and Underground Water Tanks
0
0.00
8
The External Plumbing and External Plaster, Elevation, Completion of terraces with waterproofing of the Building/Wing
0
0.00
9
Installation of lifts,Water pumps, Fire Flighting Fittings and Equipment as per CFO NOC, Electrical Fittings to Common Areas,electro,Mechanical equipment,
Compliance to conditions of environment / CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound
Wall and all other requirements as may be required to obtain Occupation/Completion Certificate
0
0.00
TABLE - B
Internal and External Development Works for the entire registered Phase/Project
S.No.
Common areas and Facilities/Amenities
Proposed Yes/No
Percentage of work done
Details if any
By the end of Last Quarter
By the end of Current Quarter
1
Internal Roads & Footpaths
0
0
2
Water Supply
0
0
3
Sewerage (chamber, lines, Septic Tank STP)
0
0
4
Storm Water Drainss
0
0
5
Landscaping & Tree Planting
0
0
6
Street Lighting
0
0
7
Community Building
0
0
8
Treatment and disposal of sewage and sullage water
0
0
9
Solid Waste management & Disposal
0
0
10
Water conservation, Rain water harvesting
0
0
11
Energy management
0
0
12
Fire protection and fire safety requirements
0
0
13
Electrical meter room, sub-station, receiving station
Certificate showing no linen or charge on the RERA retention Account :
Part 4: Stage wise Time Schedule of completion or Milestones of Construction (as provided in the allotment letter / Agreement
for Sale as per the requirements of Section 11(3)(b) of the RERA Act)
No Record Added
V. Project Common Area Details- Development Work For Whole Project
S. No.
Common Area And Facilities, Amenities
Proposed
Percentage Of Completion (%)
Drawings uploaded in online Project details or not
If no, Planned date of uploading of these drawings
1
Water Supply
0
No
31/12/2023
2
Rain Water Harvesting/ Recharging
0
Yes
No
31/12/2023
3
Sanitation(Storm Water Drainage, Sewerage, STP, Solid Water Disposal etc)
0
Yes
No
31/12/2023
4
Electrification(Transformer, Solar Energy etc)
0
Yes
No
31/12/2023
5
Fire Fighting Provision
0
Yes
No
31/12/2023
6
Others
0
Yes
No
VI. Status of Approvals
A
Noc's/Permission
Present Status
1
NOC for Environment
• Has the NOC been uploaded on RERA web portal?
• Planned date of uploading NOC
• Expected date of receipt
• Planned date of application
• Explain why not applicable
Yes
No
As per rules there is no applicability on project
2
NOC for Fire
• Has the NOC been uploaded on RERA web portal?
• Planned date of uploading NOC
• Expected date of receipt
• Planned date of application
• Explain why not applicable
Yes
No
As per rules there is no applicability on project
3
Water supply permission
• Has the NOC been uploaded on RERA web portal?
• Planned date of uploading NOC
• Expected date of receipt
• Planned date of application
• Explain why not applicable
Yes
No
No seprate permission is required as water supply is done through borewell
4
NOC from Airport Authority of India
• Has the NOC been uploaded on RERA web portal?
• Planned date of uploading NOC
• Expected date of receipt
• Planned date of application
• Explain why not applicable
Yes
No
As per rules there is no applicability on project
5
Other approval(s) if any,required for the Project
Approval for/of
• Has the NOC/Permission been uploaded on RERA web portal?
• Planned date of uploading NOC/Permission
• Expected date of receipt
• Planned date of application
• Explain why not applicable
Yes
No
B.
Revision of Building Plans
1
Date of approval of latest Building Plans already uploaded on RERA web portal
17/03/2023
2
Has there been any further Modification,Amendment or Revision, if any, issued by the competent authority with regard to the building plans already uploaded?
Yes
No
• Date of approval of revised building plans
• Has already submitted to RERA for uploading these revised building plans?
Yes
No
» (If Yes)Date of application
» (If No)Planned date of application
VII. Compliances Under the Act
1.
Insurance for the Project
Status
Under section 16 of the RERA Act, it is mandatory for the promoter to obtain insurance in respect of (i) title of the land and building as a part of the Real Estate Project and
(ii) construction of the Real Estate Project.
Has the insurance been obtained?
Yes
No
• Planned date of Insurance
31/12/2023
VIII. Details of Real Estate Agents (if any) engaged for the Project
Has any real estate agents been engaged for the Project?
Yes
No
IX. Miscellaneous
1. Is there any change in promoter profile which is not yet updated in online promoter profile?
Yes
No
2. Is there any change in project details which is not yet updated in online project profile?
Yes
No
3. Has the Completion Certificate been obtained?
Yes
No
•
If the project not completed, is the project is likely to get completed within the estimated/extended finish date given in online project details?
Yes
No
4. Has the Occupancy Certificate also been obtained?
Yes
No
Allottee Details
Building : Udhyan Apartment (Apartment : 3 BHK (MIG-B), Block : Block L, Carpet Area : 84.83 sq. meters) Number Of Apartments: 36,Booked: 0
Sr.No.
Unit/Flat Detail
Booking Status
Allottee Name
1 .
21 E/L-301
Unsold
2 .
21 E/L-202
Unsold
3 .
21 E/L-904
Unsold
4 .
21 E/L-803
Unsold
5 .
21 E/L-704
Unsold
6 .
21 E/L-401
Unsold
7 .
21 E/L-302
Unsold
8 .
21 E/L-103
Unsold
9 .
21 E/L-903
Unsold
10 .
21 E/L-804
Unsold
11 .
21 E/L-701
Unsold
12 .
21 E/L-602
Unsold
13 .
21 E/L-403
Unsold
14 .
21 E/L-304
Unsold
15 .
21 E/L-101
Unsold
16 .
21 E/L-901
Unsold
17 .
21 E/L-802
Unsold
18 .
21 E/L-603
Unsold
19 .
21 E/L-504
Unsold
20 .
21 E/L-501
Unsold
21 .
21 E/L-402
Unsold
22 .
21 E/L-203
Unsold
23 .
21 E/L-104
Unsold
24 .
21 E/L-801
Unsold
25 .
21 E/L-702
Unsold
26 .
21 E/L-503
Unsold
27 .
21 E/L-404
Unsold
28 .
21 E/L-201
Unsold
29 .
21 E/L-102
Unsold
30 .
21 E/L-902
Unsold
31 .
21 E/L-703
Unsold
32 .
21 E/L-604
Unsold
33 .
21 E/L-601
Unsold
34 .
21 E/L-502
Unsold
35 .
21 E/L-303
Unsold
36 .
21 E/L-204
Unsold
Building : Udhyan Apartment (Apartment : 3 BHK (MIG-B), Block : Block M, Carpet Area : 84.83 sq. meters) Number Of Apartments: 36,Booked: 0
Sr.No.
Unit/Flat Detail
Booking Status
Allottee Name
1 .
21 E/M-701
Unsold
2 .
21 E/M-602
Unsold
3 .
21 E/M-903
Unsold
4 .
21 E/L-804
Unsold
5 .
21 E/M-801
Unsold
6 .
21 E/M-702
Unsold
7 .
21 E/M-104
Unsold
8 .
21 E/L-904
Unsold
9 .
21 E/M-301
Unsold
10 .
21 E/M-202
Unsold
11 .
21 E/M-103
Unsold
12 .
21 E/M-503
Unsold
13 .
21 E/L-404
Unsold
14 .
21 E/M-501
Unsold
15 .
21 E/M-402
Unsold
16 .
21 E/M-303
Unsold
17 .
21 E/M-703
Unsold
18 .
21 E/L-604
Unsold
19 .
21 E/M-101
Unsold
20 .
21 E/M-901
Unsold
21 .
21 E/M-802
Unsold
22 .
21 E/L-204
Unsold
23 .
21 E/M-401
Unsold
24 .
21 E/M-302
Unsold
25 .
21 E/M-203
Unsold
26 .
21 E/M-603
Unsold
27 .
21 E/L-504
Unsold
28 .
21 E/M-601
Unsold
29 .
21 E/M-502
Unsold
30 .
21 E/M-403
Unsold
31 .
21 E/M-803
Unsold
32 .
21 E/L-704
Unsold
33 .
21 E/M-201
Unsold
34 .
21 E/M-102
Unsold
35 .
21 E/M-902
Unsold
36 .
21 E/L-304
Unsold
Building : Udhyan Apartment (Apartment : 3 BHK (MIG-B), Block : Block N, Carpet Area : 84.83 sq. meters) Number Of Apartments: 36,Booked: 0
Sr.No.
Unit/Flat Detail
Booking Status
Allottee Name
1 .
21 E/N-101
Unsold
2 .
21 E/N-901
Unsold
3 .
21 E/N-802
Unsold
4 .
21 E/N-703
Unsold
5 .
21 E/N-201
Unsold
6 .
21 E/N-102
Unsold
7 .
21 E/N-902
Unsold
8 .
21 E/N-803
Unsold
9 .
21 E/N-501
Unsold
10 .
21 E/N-402
Unsold
11 .
21 E/N-303
Unsold
12 .
21 E/N-701
Unsold
13 .
21 E/N-602
Unsold
14 .
21 E/N-503
Unsold
15 .
21 E/N-301
Unsold
16 .
21 E/N-202
Unsold
17 .
21 E/N-103
Unsold
18 .
21 E/N-903
Unsold
19 .
21 E/N-601
Unsold
20 .
21 E/N-502
Unsold
21 .
21 E/N-403
Unsold
22 .
21 E/N-801
Unsold
23 .
21 E/N-702
Unsold
24 .
21 E/N-603
Unsold
25 .
21 E/N-401
Unsold
26 .
21 E/N-302
Unsold
27 .
21 E/N-203
Unsold
28 .
21 E/N-104
Unsold
29 .
21 E/N-404
Unsold
30 .
21 E/N-704
Unsold
31 .
21 E/N-604
Unsold
32 .
21 E/N-804
Unsold
33 .
21 E/N-904
Unsold
34 .
21 E/N-504
Unsold
35 .
21 E/N-204
Unsold
36 .
21 E/N-304
Unsold
Building : Udhyan Apartment (Apartment : 3 BHK (HIG), Block : Block O, Carpet Area : 107.05 sq. meters) Number Of Apartments: 36,Booked: 0
Sr.No.
Unit/Flat Detail
Booking Status
Allottee Name
1 .
21 E/O-701
Unsold
2 .
21 E/O-602
Unsold
3 .
21 E/O-603
Unsold
4 .
21 E/O-404
Unsold
5 .
21 E/O-801
Unsold
6 .
21 E/O-702
Unsold
7 .
21 E/O-703
Unsold
8 .
21 E/O-504
Unsold
9 .
21 E/O-301
Unsold
10 .
21 E/O-202
Unsold
11 .
21 E/O-203
Unsold
12 .
21 E/O-902
Unsold
13 .
21 E/O-804
Unsold
14 .
21 E/O-501
Unsold
15 .
21 E/O-402
Unsold
16 .
21 E/O-403
Unsold
17 .
21 E/O-204
Unsold
18 .
21 E/O-101
Unsold
19 .
21 E/O-901
Unsold
20 .
21 E/O-802
Unsold
21 .
21 E/O-803
Unsold
22 .
21 E/O-604
Unsold
23 .
21 E/O-401
Unsold
24 .
21 E/O-302
Unsold
25 .
21 E/O-303
Unsold
26 .
21 E/O-104
Unsold
27 .
21 E/O-904
Unsold
28 .
21 E/O-601
Unsold
29 .
21 E/O-502
Unsold
30 .
21 E/O-503
Unsold
31 .
21 E/O-304
Unsold
32 .
21 E/O-201
Unsold
33 .
21 E/O-102
Unsold
34 .
21 E/O-103
Unsold
35 .
21 E/O-903
Unsold
36 .
21 E/O-704
Unsold
Building : Udhyan Apartment (Apartment : 3 BHK (HIG), Block : Block P, Carpet Area : 107.05 sq. meters) Number Of Apartments: 36,Booked: 0
Sr.No.
Unit/Flat Detail
Booking Status
Allottee Name
1 .
21 E/P-401
Unsold
2 .
21 E/P-302
Unsold
3 .
21 E/P-203
Unsold
4 .
21 E/P-104
Unsold
5 .
21 E/P-904
Unsold
6 .
21 E/P-101
Unsold
7 .
21 E/P-901
Unsold
8 .
21 E/P-802
Unsold
9 .
21 E/P-703
Unsold
10 .
21 E/P-604
Unsold
11 .
21 E/P-301
Unsold
12 .
21 E/P-202
Unsold
13 .
21 E/P-103
Unsold
14 .
21 E/P-903
Unsold
15 .
21 E/P-804
Unsold
16 .
21 E/P-701
Unsold
17 .
21 E/P-602
Unsold
18 .
21 E/P-503
Unsold
19 .
21 E/P-404
Unsold
20 .
21 E/P-501
Unsold
21 .
21 E/P-402
Unsold
22 .
21 E/P-303
Unsold
23 .
21 E/P-204
Unsold
24 .
21 E/P-801
Unsold
25 .
21 E/P-702
Unsold
26 .
21 E/P-603
Unsold
27 .
21 E/P-504
Unsold
28 .
21 E/P-201
Unsold
29 .
21 E/P-102
Unsold
30 .
21 E/P-902
Unsold
31 .
21 E/P-803
Unsold
32 .
21 E/P-704
Unsold
33 .
21 E/P-601
Unsold
34 .
21 E/P-502
Unsold
35 .
21 E/P-403
Unsold
36 .
21 E/P-304
Unsold
Building : Udhyan Apartment (Apartment : 3 BHK (HIG), Block : Block Q, Carpet Area : 107.05 sq. meters) Number Of Apartments: 36,Booked: 0
Sr.No.
Unit/Flat Detail
Booking Status
Allottee Name
1 .
21 E/Q-801
Unsold
2 .
21 E/Q-702
Unsold
3 .
21 E/Q-603
Unsold
4 .
21 E/Q-504
Unsold
5 .
21 E/Q-501
Unsold
6 .
21 E/Q-402
Unsold
7 .
21 E/Q-303
Unsold
8 .
21 E/Q-204
Unsold
9 .
21 E/Q-701
Unsold
10 .
21 E/Q-602
Unsold
11 .
21 E/Q-503
Unsold
12 .
21 E/Q-404
Unsold
13 .
21 E/Q-301
Unsold
14 .
21 E/Q-202
Unsold
15 .
21 E/Q-103
Unsold
16 .
21 E/Q-903
Unsold
17 .
21 E/Q-804
Unsold
18 .
21 E/Q-101
Unsold
19 .
21 E/Q-901
Unsold
20 .
21 E/Q-802
Unsold
21 .
21 E/Q-703
Unsold
22 .
21 E/Q-604
Unsold
23 .
21 E/Q-401
Unsold
24 .
21 E/Q-302
Unsold
25 .
21 E/Q-203
Unsold
26 .
21 E/Q-104
Unsold
27 .
21 E/Q-904
Unsold
28 .
21 E/Q-601
Unsold
29 .
21 E/Q-502
Unsold
30 .
21 E/Q-403
Unsold
31 .
21 E/Q-304
Unsold
32 .
21 E/Q-201
Unsold
33 .
21 E/Q-102
Unsold
34 .
21 E/Q-902
Unsold
35 .
21 E/Q-803
Unsold
36 .
21 E/Q-704
Unsold
Building : Udhyan Apartment (Apartment : 3 BHK (HIG), Block : Block R, Carpet Area : 107.05 sq. meters) Number Of Apartments: 36,Booked: 0
Sr.No.
Unit/Flat Detail
Booking Status
Allottee Name
1 .
21 E/R-401
Unsold
2 .
21 E/R-302
Unsold
3 .
21 E/R-203
Unsold
4 .
21 E/R-104
Unsold
5 .
21 E/R-904
Unsold
6 .
21 E/R-101
Unsold
7 .
21 E/R-901
Unsold
8 .
21 E/R-802
Unsold
9 .
21 E/R-703
Unsold
10 .
21 E/R-604
Unsold
11 .
21 E/R-301
Unsold
12 .
21 E/R-202
Unsold
13 .
21 E/R-103
Unsold
14 .
21 E/R-903
Unsold
15 .
21 E/R-804
Unsold
16 .
21 E/R-701
Unsold
17 .
21 E/R-602
Unsold
18 .
21 E/R-503
Unsold
19 .
21 E/R-404
Unsold
20 .
21 E/R-501
Unsold
21 .
21 E/R-402
Unsold
22 .
21 E/R-303
Unsold
23 .
21 E/R-204
Unsold
24 .
21 E/R-801
Unsold
25 .
21 E/R-702
Unsold
26 .
21 E/R-603
Unsold
27 .
21 E/R-504
Unsold
28 .
21 E/R-201
Unsold
29 .
21 E/R-102
Unsold
30 .
21 E/R-902
Unsold
31 .
21 E/R-803
Unsold
32 .
21 E/R-704
Unsold
33 .
21 E/R-601
Unsold
34 .
21 E/R-502
Unsold
35 .
21 E/R-403
Unsold
36 .
21 E/R-304
Unsold
Building : Udhyan Apartment (Apartment : 3 BHK (HIG), Block : Block S, Carpet Area : 107.05 sq. meters) Number Of Apartments: 36,Booked: 0
Sr.No.
Unit/Flat Detail
Booking Status
Allottee Name
1 .
21 E/S-801
Unsold
2 .
21 E/S-702
Unsold
3 .
21 E/S-603
Unsold
4 .
21 E/S-501
Unsold
5 .
21 E/S-402
Unsold
6 .
21 E/S-303
Unsold
7 .
21 E/S-701
Unsold
8 .
21 E/S-602
Unsold
9 .
21 E/S-503
Unsold
10 .
21 E/S-301
Unsold
11 .
21 E/S-202
Unsold
12 .
21 E/S-103
Unsold
13 .
21 E/S-903
Unsold
14 .
21 E/S-101
Unsold
15 .
21 E/S-901
Unsold
16 .
21 E/S-802
Unsold
17 .
21 E/S-703
Unsold
18 .
21 E/S-401
Unsold
19 .
21 E/S-302
Unsold
20 .
21 E/S-203
Unsold
21 .
21 E/S-104
Unsold
22 .
21 E/S-601
Unsold
23 .
21 E/S-502
Unsold
24 .
21 E/S-403
Unsold
25 .
21 E/S-201
Unsold
26 .
21 E/S-102
Unsold
27 .
21 E/S-902
Unsold
28 .
21 E/S-803
Unsold
29 .
21 E/S-404
Unsold
30 .
21 E/S-704
Unsold
31 .
21 E/S-604
Unsold
32 .
21 E/S-804
Unsold
33 .
21 E/S-904
Unsold
34 .
21 E/S-504
Unsold
35 .
21 E/S-204
Unsold
36 .
21 E/S-304
Unsold
Undertaking
I/ we solemnly affirm, declare and undertake that all the details started above are true to the best of my knowledge and nothing material has been concealed there from.
I am executing this undertaking to attest to the truth of all the foregoing and to apprise the RERA Authority of such facts as mentioned as well as for whatever other
legal purposes this undertaking amy serve.