Project Modification Summary

RERA

APPLICATION FOR MODIFICATION OF PROJECT PROFILE

Particulars of the Registered Project
Application No. : RAJ-RERA-APP-SPM-2024-1129 (6/6/2024)
Name of the Registered Project RASIK RESIDENCY Project Status COMPLETED
Registration Number RAJ/P/2022/2100 Name of the Promoter
Name of Other Promoter(s) Project Address Plot No. A-6 & A-11Nandan Vihar, Mahal Jagatpura Jaipur Jaipur
Project Type Group Housing Phase Area (in Sq. Mt.) 1106.47
Project registration vaild till (As per RC/ Form F, whichever is latest) 12/31/2026 Project registration certificate (As per RC/ Form F, whichever is latest) View
Project Modification Request
SELECT PARTICULARS Existing Online Details Proposed Modified Details Reason for Modification and in case of documents specify the documents/part which is being replaced/changed Supporting Documents and detailed application(If any)
Water Supply That now we have uploaded the Water Supply Drawing
Rain Water Harvesting/ Recharging That now we have uploaded the Rain Water Harvesting/ Recharging Drawing
Sanitation(Storm Water Drainage, Sewerage, STP, Solid Water Disposal etc) That now we have uploaded the Sanitation
Electrification(Transformer, Solar Energy etc) That now we have uploaded the Electrification Drawings
Fire Fighting Provision That now we have uploaded the Fire Fighting Drawings
BUILDING/ APARTMENT DETAILS (Other Than Plotted Development)
Building/ Apartment Details View View That now we have uploade tha Drawing
NOC for Fire That now we have uploaded the Fire NOC
Declaration
I/ we do hereby solemnly declare and undertake: That the changes/updations proposed by me/us in the Project details are correct and shall not affect/ damage the rights and interests of the allottee(s) of the project. If, however, due to such modification, any damages or losses are suffered by any allottee(s) or any rights and interests of any allottee(s) are adversely affected or any dispute arises, promoter of the project shall be solely responsible and liable to compensate for the same and to resolve the dispute and shall also be liable for all other legal and financial consequences thereof
Payment Details
Payment Amount Payment Date Download Receipt
₹ 5,000.00 6/6/2024 Generate Payment Slip

Contact Person Details

Contact Person Name MobileNo Email
Hitesh 7073033278 rawatprateekandco@gmail.com
Comments Details
PARA Created BY Comments Date Status Document
1 Veer Bahadur Gurjar (10678) Rs.5000/- Deposited by RERA Trans. No 2758 Dated 06.06.2024 FOR MODIFICATION OF PROJECT DETAILS. 6/7/2024 PENDING WITH NODAL OFFICER
2 Puneet Kapoor (10671) Dear Applicant, Following details need to be addressed in your Online application:- 1.)On Service drawing get the sign and Seal of Respective engineer instead of sign and seal on behalf of firm. 2.) Under section of common facility Drawing:-Upload Proper Rainwater harvesting drawing is to be uploaded:-Presently a rainwater tank typical plan and section showing sheet is uploaded .On Common area demarcation of Rainwater harvesting chambers and flow on site sheet is not uploaded. Upload the same. 3.)In section of Building/Apartmnet details in tab of Plumbing on PDF sheet no 2/3 on One side your sheet title is Typical/Stilt floor drainage plan and on other side titled as Stilt floor roof shuttering plan. 4.)In tab of Architectural drawing also upload the Section/Elevation and Staircase/ Balcony railing details; 5.)On structure drawing uploaded get address and Project name apprised as presently it is written as Raman Ji Jagatpura. 6.)In tab of Services specify as where is :- (SLD/ distribution details after LT panel, earthling layout, external lighting plan/ layout, lighting arrester location &pit location, coordination drawings, Comply with the same by on or before 17.06.2024 6/10/2024 APPLICATION OBJECTED
3 Promoter 1. That now we have uploaded Service Drawings get the sign and seal of respective Engineer. 2. That now we have uploaded Proper Rain Water Harvesting Drawing. 3. That now we have uploaded Plumbing Drawings in section of Building/ Apartment details in tab of Plumbing. 4. That now we have uploaded Architectural drawings. 5. That now we have uploaded Structure Drawings. 6. That now we have uploaded Service Drawings in tab of Service. 7/15/2024 PENDING WITH DEPUTY REGISTRAR
4 Puneet Kapoor (10671) In this application, Promoter has applied for the updation of service drawings of the project, along with uploading the Fire NOC, Application is submitted for kind perusal and approval. 7/17/2024 PENDING WITH JOINT REGISTRAR
5 Ramesh Sharma (9009) Record Pulled by REGISTRAR 7/18/2024 PENDING WITH REGISTRAR
6 Ramesh Sharma (9009) Submitted for perusal and approval,madam. 7/20/2024 PENDING WITH CHAIRMAN
7 Chairman Rajasthan (1) approved 7/22/2024 APPLICATION APPROVED