APARTMENTS TYPE DETAILS
Sanctioned
Apartment Type |
Block Number |
Carpet Area (In sq. meters) |
Area of Exclusive Balcony (In sq. meters) |
Area of Exclusive Verandah (In sq. meters) |
Area of Exclusive Terrace (In sq. meters) |
Area of Exclusive Store (In sq. meters) |
Any Other Area (In sq. meters) |
Proposed Number of Apartments |
Number of Apartments Booked/Allotted/Sold |
Floor-Flat No.: Ground-101, 1st-201, 2nd-301, 3rd-401, 4th-501, 5th-601:All 3BHK |
1 |
74.65 |
4.47 |
0.00 |
0.00 |
0.00 |
0.00 |
6 |
0 |
Document Name |
View |
Floor Plan (Door, windows, rooms, LB, Kitchen, if any) |
view
|
Electrical Drawings (Showing Electrical Legend, Floor Lighting Plan, Floor Power Plan, Single Line Diagram, Fire Alarm Layout, Floor Sound System and CCTV Camera, Equivalency Chart, Lightening Protection Earthing Details, if any) |
view
|
Plumbing Drawings (Showing pipelines of W/S, fixtures, tape, W/C, water tank, sewerage line, drainage lines, if any) |
view
|
HVAC Drawing (Showing air ducting, ac shafts etc , if any) |
view
|
|
Floor-Flat No.: Ground-102, 1st-202, 2nd-302, 3rd-402, 4th-502, 5th-602:All 3BHK |
1 |
77.74 |
5.57 |
0.00 |
0.00 |
0.00 |
0.00 |
6 |
0 |
Document Name |
View |
Floor Plan (Door, windows, rooms, LB, Kitchen, if any) |
view
|
Electrical Drawings (Showing Electrical Legend, Floor Lighting Plan, Floor Power Plan, Single Line Diagram, Fire Alarm Layout, Floor Sound System and CCTV Camera, Equivalency Chart, Lightening Protection Earthing Details, if any) |
view
|
Plumbing Drawings (Showing pipelines of W/S, fixtures, tape, W/C, water tank, sewerage line, drainage lines, if any) |
view
|
HVAC Drawing (Showing air ducting, ac shafts etc , if any) |
view
|
|
Floor-Flat No.: Ground-103, 1st-203, 2nd-303, 3rd-403, 4th-503, 5th-603:All 3BHK |
1 |
80.28 |
5.57 |
0.00 |
0.00 |
0.00 |
0.00 |
6 |
0 |
Document Name |
View |
Floor Plan (Door, windows, rooms, LB, Kitchen, if any) |
view
|
Electrical Drawings (Showing Electrical Legend, Floor Lighting Plan, Floor Power Plan, Single Line Diagram, Fire Alarm Layout, Floor Sound System and CCTV Camera, Equivalency Chart, Lightening Protection Earthing Details, if any) |
view
|
Plumbing Drawings (Showing pipelines of W/S, fixtures, tape, W/C, water tank, sewerage line, drainage lines, if any) |
view
|
HVAC Drawing (Showing air ducting, ac shafts etc , if any) |
view
|
|
Floor-Flat No.: Ground-104, 1st-204, 2nd-304, 3rd-404, 4th-504, 5th-604:All 3BHK |
1 |
73.47 |
4.37 |
0.00 |
0.00 |
0.00 |
0.00 |
6 |
0 |
Document Name |
View |
Floor Plan (Door, windows, rooms, LB, Kitchen, if any) |
view
|
Electrical Drawings (Showing Electrical Legend, Floor Lighting Plan, Floor Power Plan, Single Line Diagram, Fire Alarm Layout, Floor Sound System and CCTV Camera, Equivalency Chart, Lightening Protection Earthing Details, if any) |
view
|
Plumbing Drawings (Showing pipelines of W/S, fixtures, tape, W/C, water tank, sewerage line, drainage lines, if any) |
view
|
HVAC Drawing (Showing air ducting, ac shafts etc , if any) |
view
|
|
Floor-Flat No.: Ground-105, 1st-205, 2nd-305, 3rd-405, 4th-505, 5th-605:All 3BHK |
1 |
74.47 |
5.49 |
0.00 |
0.00 |
0.00 |
0.00 |
6 |
0 |
Document Name |
View |
Floor Plan (Door, windows, rooms, LB, Kitchen, if any) |
view
|
Electrical Drawings (Showing Electrical Legend, Floor Lighting Plan, Floor Power Plan, Single Line Diagram, Fire Alarm Layout, Floor Sound System and CCTV Camera, Equivalency Chart, Lightening Protection Earthing Details, if any) |
view
|
Plumbing Drawings (Showing pipelines of W/S, fixtures, tape, W/C, water tank, sewerage line, drainage lines, if any) |
view
|
HVAC Drawing (Showing air ducting, ac shafts etc , if any) |
view
|
|
Floor-Flat No.: Ground-106, 1st-206, 2nd-306, 3rd-406, 4th-506, 5th-606:All 3BHK |
1 |
80.04 |
3.56 |
0.00 |
0.00 |
0.00 |
0.00 |
6 |
0 |
Document Name |
View |
Floor Plan (Door, windows, rooms, LB, Kitchen, if any) |
view
|
Electrical Drawings (Showing Electrical Legend, Floor Lighting Plan, Floor Power Plan, Single Line Diagram, Fire Alarm Layout, Floor Sound System and CCTV Camera, Equivalency Chart, Lightening Protection Earthing Details, if any) |
view
|
Plumbing Drawings (Showing pipelines of W/S, fixtures, tape, W/C, water tank, sewerage line, drainage lines, if any) |
view
|
HVAC Drawing (Showing air ducting, ac shafts etc , if any) |
view
|
|
Floor-Flat No.: Ground-107, 1st-207, 2nd-307, 3rd-407, 4th-507, 5th-607:All 3BHK |
1 |
74.33 |
4.62 |
0.00 |
0.00 |
0.00 |
0.00 |
6 |
0 |
Document Name |
View |
Floor Plan (Door, windows, rooms, LB, Kitchen, if any) |
view
|
Electrical Drawings (Showing Electrical Legend, Floor Lighting Plan, Floor Power Plan, Single Line Diagram, Fire Alarm Layout, Floor Sound System and CCTV Camera, Equivalency Chart, Lightening Protection Earthing Details, if any) |
view
|
Plumbing Drawings (Showing pipelines of W/S, fixtures, tape, W/C, water tank, sewerage line, drainage lines, if any) |
view
|
HVAC Drawing (Showing air ducting, ac shafts etc , if any) |
view
|
|
Not Sanctioned
Apartment Type |
Block Number |
Carpet Area (In sq. meters) |
Area of Exclusive Balcony (In sq. meters) |
Area of Exclusive Verandah (In sq. meters) |
Area of Exclusive Terrace (In sq. meters) |
Area of Exclusive Store (In sq. meters) |
Any Other Area (In sq. meters) |
Proposed Number of Apartments |
Number of Apartments Booked/Allotted/Sold |
- |
- |
- |
- |
0 |
0 |
|