1 |
Veer Bahadur Gurjar (10678) |
Rs.5000/- Deposited by RERA Trans. No 171 Dated 10.10.2024 FOR MODIFICATION OF PROJECT DETAILS. |
10/14/2024 |
PENDING WITH DEPUTY REGISTRAR |
|
2 |
Puneet Kapoor (10671) |
Dear Applicant,
Following details need to be addressed in your online application:-
1.)In section of Building documents in tab of “Common Plumbing” also upload the Stilt floor plumbing drawing;
2.) In section of Building documents in tab of “electrical drawing” also upload the Typical floor electrical drawing;
3.)Name of promoter is not reflecting in this application, seems to eb IT concern generate the IT request;
4.)In tab of Architectural drawing:-Re-scan the ground to 08 floor working drawing sheet and also upload the Balcony/Railing details;
5.)Re-scan and Re-upload the Structure drawings as on some drawings floor number/Address and some details are not legible properly;
Comply with the same by on or before 11.11.2024
|
11/4/2024 |
APPLICATION OBJECTED |
|
3 |
Promoter |
Sir, all the objections have been complied with and IT request has also been raised. Humble request to kindly approve the same. |
11/28/2024 |
PENDING WITH DEPUTY REGISTRAR |
|
4 |
Puneet Kapoor (10671) |
Submit Point wise reply for the observations mentioned at para no 2/N respectively; |
11/29/2024 |
APPLICATION OBJECTED |
|
5 |
Promoter |
Sir, For your kind reference, pointwise reply for the objections mentioned at para 2N are as follows:-
1. In reply to objection 1 it is submitted that in tab of Common Plumbing, Stilt floor plumbing drawings have been uploaded.
2. In reply to objection 2 it is submitted that in tab of building documents, typical floor electrical drawings have been uploaded in “electrical drawings” tab.
3. In reply to objection 3 it is submitted that IT request bearing ticket no. 19147282 has been raised. Hopefully the promoter name will be reflected now, however, IT request is still pending.
4. In reply to objection 4 it is submitted that Architectural drawings have been rescanned from ground to 8 floors and along with that Balcony/railing details have also been uploaded.
5. In reply to objection 5 it is submitted that legible Structural Drawings have been now uploaded.
|
11/30/2024 |
PENDING WITH DEPUTY REGISTRAR |
|
6 |
Puneet Kapoor (10671) |
In this application, applicant is proposing so as to upload the Service drawings, Structure drawings and Fire NOC, Therefore application is submitted for kind perusal and approval. |
12/5/2024 |
PENDING WITH JOINT REGISTRAR |
|
7 |
R.S. Kulhari (9009) |
Record Pulled by REGISTRAR |
12/5/2024 |
PENDING WITH REGISTRAR |
|
8 |
R.S. Kulhari (9009) |
Submitted for kind perusal and approval, Madam. |
12/6/2024 |
PENDING WITH CHAIRMAN |
|
9 |
Chairman Rajasthan (1) |
Approved |
12/6/2024 |
APPLICATION APPROVED |
|