Project Modification Summary

RERA

APPLICATION FOR MODIFICATION OF PROJECT PROFILE

Particulars of the Registered Project
Application No. : RAJ-RERA-APP-SPM-2024-1196 (7/20/2024)
Name of the Registered Project Dream Homz Project Status LAPSED
Registration Number RAJ/P/2020/1259 Name of the Promoter G S DREAMHOME LLP
Name of Other Promoter(s) Project Address 1296 & 1306Pushkar Bypass MAKARWALI Ajmer Ajmer
Project Type Group Housing Phase Area (in Sq. Mt.) 11352.55
Project registration vaild till (As per RC/ Form F, whichever is latest) 5/31/2024 Project registration certificate (As per RC/ Form F, whichever is latest) View
Project Modification Request
SELECT PARTICULARS Existing Online Details Proposed Modified Details Reason for Modification and in case of documents specify the documents/part which is being replaced/changed Supporting Documents and detailed application(If any)
Water Supply Clear and Legible Drawings uploaded
Rain Water Harvesting/ Recharging Clear and Legible Drawings uploaded
Sanitation(Storm Water Drainage, Sewerage, STP, Solid Water Disposal etc) Clear and Legible Drawings uploaded
Electrification(Transformer, Solar Energy etc) Clear and Legible Drawings uploaded
Fire Fighting Provision Clear and Legible Drawings uploaded
BUILDING/ APARTMENT DETAILS (Other Than Plotted Development)
Building/ Apartment Details View View Building Drawings Uploaded
NOC for Fire Fire NOC uploaded
Declaration
I/ we do hereby solemnly declare and undertake: That the changes/updations proposed by me/us in the Project details are correct and shall not affect/ damage the rights and interests of the allottee(s) of the project. If, however, due to such modification, any damages or losses are suffered by any allottee(s) or any rights and interests of any allottee(s) are adversely affected or any dispute arises, promoter of the project shall be solely responsible and liable to compensate for the same and to resolve the dispute and shall also be liable for all other legal and financial consequences thereof
Payment Details
Payment Amount Payment Date Download Receipt
₹ 5,000.00 7/20/2024 Generate Payment Slip

Contact Person Details

Contact Person Name MobileNo Email
Pragya Naulakha Banthia 9950461789 acspragya52417@gmail.com
Comments Details
PARA Created BY Comments Date Status Document
1 Veer Bahadur Gurjar (10678) Rs.5000/- Deposited by RERA Trans. No 4024 Dated 20.07.2024 FOR MODIFICATION OF PROJECT DETAILS. 7/22/2024 PENDING WITH NODAL OFFICER
2 Jitendra Tripathi (10665) 1. Upload clear legible common area services drawing of Water Supply, Sanitation(Storm Water Drainage, Sewerage, STP, Solid Water Disposal etc), Electrification(Transformer, Solar Energy etc) & Fire Fighting Provision. duly signed & sealed with name of qualified engineer. 2. Upload detailed structure, architectural drawings under building documents. Comply with the same by on or before 06.08.2024 7/29/2024 APPLICATION OBJECTED
3 R.S. Kulhari (9009) Record Pulled by REGISTRAR 11/5/2024 PENDING WITH REGISTRAR
4 R.S. Kulhari (9009) The promoter is granted 15 days time to rectify the deficiencies failing which the application shall be considered for rejection. 11/5/2024 PENDING WITH DEPUTY REGISTRAR
5 Puneet Kapoor (10671) May kindly refer para no.4/N:- Rectify the deficiencies by on or before 20.11.2024 or the application shall be considered for rejection. 11/6/2024 APPLICATION OBJECTED
6 Promoter 1. Clear legible common area services drawing of Water Supply, Sanitation(Storm Water Drainage, Sewerage, STP, Solid Water Disposal etc), Electrification(Transformer, Solar Energy etc) & Fire Fighting Provision duly signed & sealed by the engineer has been uploaded. 2. Detailed structure, architectural drawings under building documents has been uploaded for your kind perusal. 11/18/2024 PENDING WITH NODAL OFFICER
7 MeghaJain (39593) There are still some pendency in the application: 1. Upload the terrace plan of each block that includes the overhead water tanks as part of the water supply drawing. 2. Provide the terrace drainage plan for Block A, as it is currently missing, under rain water harvesting tab. 3. Under the Architectural Drawing tab, instead of the service drawing, upload the working plans for all blocks (A, B, C, and D), along with typical individual unit layouts for each block, staircase details, railing specifications, and kitchen details if applicable. 4. Update the status of the fire NOC for this project. 11/25/2024 APPLICATION OBJECTED
8 Promoter 1. The terrace plan of each block that includes the overhead water tanks has been uploaded under the water supply drawing tab. 2. The terrace drainage plan for Block A has been uploaded under rain water harvesting tab. 3. Under the Architectural Drawing tab, the working plans for all blocks (A, B, C, and D) Typical individual unit layouts for each block, staircase details, railing specifications, and kitchen details has been uploaded. 4. Fire NOC for this project has been uploaded for your kind perusal. 12/16/2024 PENDING WITH NODAL OFFICER
9 MeghaJain (39593) In this application, the Promoter has applied to upload the service drawings of the project. The application is submitted for your kind perusal and approval. 2/3/2025 PENDING WITH JOINT REGISTRAR
10 R.S. Kulhari (9009) Record Pulled by REGISTRAR 2/7/2025 PENDING WITH REGISTRAR
11 R.S. Kulhari (9009) Submitted for kind perusal and approval, Madam. 2/7/2025 PENDING WITH CHAIRMAN
12 Chairman Rajasthan (1) Approved 2/8/2025 APPLICATION APPROVED