Project Modification Summary

RERA

APPLICATION FOR MODIFICATION OF PROJECT PROFILE

Particulars of the Registered Project
Application No. : RAJ-RERA-APP-SPM-2024-835 (2/9/2024)
Name of the Registered Project VEDIC VILLAS PHASE-I Project Status COMPLETED
Registration Number RAJ/P/2020/1198 Name of the Promoter SHREE RADHE KRISHNA LANDCON LLP
Name of Other Promoter(s) Project Address 1/207Jaipur LALARPURA Jaipur Jaipur
Project Type Group Housing Phase Area (in Sq. Mt.) 6055.44
Project registration vaild till (As per RC/ Form F, whichever is latest) 12/31/2023 Project registration certificate (As per RC/ Form F, whichever is latest) View
Project Modification Request
SELECT PARTICULARS Existing Online Details Proposed Modified Details Reason for Modification and in case of documents specify the documents/part which is being replaced/changed Supporting Documents and detailed application(If any)
Water Supply Water Supply drawings
Rain Water Harvesting/ Recharging rain water harvesting
Sanitation(Storm Water Drainage, Sewerage, STP, Solid Water Disposal etc) Sanitation drawings
Electrification(Transformer, Solar Energy etc) Electrification drawings
Fire Fighting Provision DECLARATION
BUILDING/ APARTMENT DETAILS (Other Than Plotted Development)
Building/ Apartment Details View View Service drawings
Declaration
I/ we do hereby solemnly declare and undertake: That the changes/updations proposed by me/us in the Project details are correct and shall not affect/ damage the rights and interests of the allottee(s) of the project. If, however, due to such modification, any damages or losses are suffered by any allottee(s) or any rights and interests of any allottee(s) are adversely affected or any dispute arises, promoter of the project shall be solely responsible and liable to compensate for the same and to resolve the dispute and shall also be liable for all other legal and financial consequences thereof
Payment Details
Payment Amount Payment Date Download Receipt
₹ 5,000.00 2/9/2024 Generate Payment Slip

Contact Person Details

Contact Person Name MobileNo Email
Rajesh Gupta 9929777224 rguptablue@gmail.com
Comments Details
PARA Created BY Comments Date Status Document
1 Veer Bahadur Gurjar (10678) Rs.5000/- Deposited by RERA Trans. No.611 Dated 09.02.2024 FOR MODIFICATION OF PROJECT DETAILS. 2/12/2024 PENDING WITH NODAL OFFICER
2 Puneet Kapoor (10671) Dear Applicant, Following details need to be addressed in your Online application:- 1.) Rain water harvesting drawing in common facility tab is not uploaded? At the time of registration you have given a declaration also including Rainwater harvesting,Fire Fighting dwg as “Under Process”, Therefore clarify the same. 2.) Clarify and Comment when different type design are uploaded for different plot number at the time of Registration however in Building Document tab under the tab of Electrical,Plumbing,Architectural,Structure one Typical floor plan sheet is only uploaded?Clarify Comply with the same by on or before 27.02.2024 2/20/2024 APPLICATION OBJECTED
3 Promoter APPLICATION SUBMITTED 3/9/2024 PENDING WITH NODAL OFFICER
4 Puneet Kapoor (10671) In reference to Observation mentioned at para no 2/N:-Submit your Point wise reply. Comply with the same by on or before 27.03.2024 3/20/2024 APPLICATION OBJECTED
5 Promoter 1.) Rain water harvesting drawing in common facility tab - uploaded Fire Fighting dwg not applicable, declaration revised uploaded. 2.) drawings of different type design are uploaded for different Villas in Building Document tab. Kindly approve 3/26/2024 PENDING WITH NODAL OFFICER
6 Puneet Kapoor (10671) 1.)Despite Communication earlier Rain water harvesting drawing in common facility tab is not uploaded.Upload Rain water harvesting drawing along with nomenclature/Titled as Rain water harvesting. 2.)Under Structure drawing on PDF sheet no 11/11 w.r.t L13 To L22:-Sign and seal of Structure engineer is not apprised. 3.)Also re-check as in Building/Apartment in tab of Fire Fighting you are uploading declaration as Fire Fighting not applicable. Comply with the same by on or before 10.04.2024 4/3/2024 APPLICATION OBJECTED
7 Promoter 1.)Rain water harvesting drawing in common facility tab uploaded 2.)Structure drawing w.r.t L13 To L22:-Signed and sealed sheet uploaded 3.)Fire Fighting is not applicable in our project as our project is under group housing villa project and as per applicable laws Fire Fighting is not applicable. Declaration for the not applicability of Fire Fighting is uploaded. 4/6/2024 PENDING WITH NODAL OFFICER
8 Puneet Kapoor (10671) Re-check as in Building/Apartment in tab of Fire Fighting you are uploading declaration as Fire Fighting and Rainwater harvesting not applicable, However on other side Rainwater harvesting drawing is now uploaded by you. Comply with the same by on or before 25.04.2024 4/18/2024 APPLICATION OBJECTED
9 Promoter Revised declaration uplaoded 4/19/2024 PENDING WITH NODAL OFFICER
10 Puneet Kapoor (10671) In this application, applicant is applying so as to upload the Service drawings of the Project and also refer para no 7/N,Point no 3. Therefore Application is submitted for kind perusal and further approval. 4/22/2024 PENDING WITH JOINT REGISTRAR
11 Ramesh Sharma (9009) Record Pulled by REGISTRAR 4/23/2024 PENDING WITH REGISTRAR
12 Ramesh Sharma (9009) Submitted for perusal and approval, madam. 4/23/2024 PENDING WITH CHAIRMAN
13 Chairman Rajasthan (1) approved 4/24/2024 APPLICATION APPROVED