Quarterly Progress Report Summary Details October to December, 2023

Quarterly Progress Report Summary Details October to December, 2023

I. Particulars of the Project 213
Application No. : RAJ-RERA-APP-QPR-2024-21180 (29/01/2024)
Name of the Registered project Ashiana Umang Phase V and Ashiana Umang Plaza Registration No. of the Project RAJ/P/2021/1430
Name of the Promoter Ashiana Housing Limited Name of other Promoter(s) None
Project Address Khasra No./ Plot No.432,433, 434,434/735,435,436,437,437/736,438,439,440,453,454,454/2,454/1,478,478/716,479,480,481,482,484,485,500,502,503,504/1, , Village- Village Jhai , Near Mahindra SEZ, Ajmer Road , Jaipur - 302026 (Rajasthan)
Type of Project Group Housing Number of Sanctioned Apartments/Plots 328
Total Area of Project(In sq. meters) 79,144.22 Phase Area (In sq. meters) 19,618.40
Registration certificate is valid upto 31-10-2024 Registration extended upto Not Applicable
II. Number and type of apartments booked ( October to December, 2023 )
Building Name : Block P
Apartment Type Block Number Carpet Area (Excluding balcony / Verandah / terrace) (In sq. meters) Area of Exclusive Balcony and Verandah Total Number of Sanctioned Apartments Number of Apartments booked/ sold/ allotted at the time of registration or by the end of last quarter Cumulative Number of Apartments booked/ sold/ allotted by the end of the current quarter
3BHK+Store Block 1 113.17 9.34 52 52
Total 52 52 0
II. Number and type of apartments booked ( October to December, 2023 )
Building Name : Block P1
Apartment Type Block Number Carpet Area (Excluding balcony / Verandah / terrace) (In sq. meters) Area of Exclusive Balcony and Verandah Total Number of Sanctioned Apartments Number of Apartments booked/ sold/ allotted at the time of registration or by the end of last quarter Cumulative Number of Apartments booked/ sold/ allotted by the end of the current quarter
3BHK+3T Block 1 98.33 9.25 52 41
Total 52 41 2
II. Number and type of apartments booked ( October to December, 2023 )
Building Name : Block S
Apartment Type Block Number Carpet Area (Excluding balcony / Verandah / terrace) (In sq. meters) Area of Exclusive Balcony and Verandah Total Number of Sanctioned Apartments Number of Apartments booked/ sold/ allotted at the time of registration or by the end of last quarter Cumulative Number of Apartments booked/ sold/ allotted by the end of the current quarter
2BHK Block 1 74.24 8.68 26 23
3BHK+3T Block 1 98.27 9.31 26 24
Total 52 47 4
II. Number and type of apartments booked ( October to December, 2023 )
Building Name : Block S1
Apartment Type Block Number Carpet Area (Excluding balcony / Verandah / terrace) (In sq. meters) Area of Exclusive Balcony and Verandah Total Number of Sanctioned Apartments Number of Apartments booked/ sold/ allotted at the time of registration or by the end of last quarter Cumulative Number of Apartments booked/ sold/ allotted by the end of the current quarter
2BHK Block 1 74.24 8.68 52 46
Total 52 46 1
II. Number and type of apartments booked ( October to December, 2023 )
Building Name : Block S2
Apartment Type Block Number Carpet Area (Excluding balcony / Verandah / terrace) (In sq. meters) Area of Exclusive Balcony and Verandah Total Number of Sanctioned Apartments Number of Apartments booked/ sold/ allotted at the time of registration or by the end of last quarter Cumulative Number of Apartments booked/ sold/ allotted by the end of the current quarter
2BHK Block 1 74.24 8.68 52 43
Total 52 43 2
II. Number and type of apartments booked ( October to December, 2023 )
Building Name : Block S3
Apartment Type Block Number Carpet Area (Excluding balcony / Verandah / terrace) (In sq. meters) Area of Exclusive Balcony and Verandah Total Number of Sanctioned Apartments Number of Apartments booked/ sold/ allotted at the time of registration or by the end of last quarter Cumulative Number of Apartments booked/ sold/ allotted by the end of the current quarter
2BHK Block 1 74.24 8.68 26 17
3BHK+3T Block 1 98.27 9.31 26 20
Total 52 37 6
II. Number and type of apartments booked ( October to December, 2023 )
Building Name : Block T
Apartment Type Block Number Carpet Area (Excluding balcony / Verandah / terrace) (In sq. meters) Area of Exclusive Balcony and Verandah Total Number of Sanctioned Apartments Number of Apartments booked/ sold/ allotted at the time of registration or by the end of last quarter Cumulative Number of Apartments booked/ sold/ allotted by the end of the current quarter
Shop 1 Block 1 11.68 0.00 1 1
Shop 10 Block 1 18.93 0.00 1 1
Shop 11 Block 1 18.98 0.00 1 1
Shop 12 Block 1 18.97 0.00 1 1
Shop 13 Block 1 82.13 0.00 1 0
Shop 14 Block 1 51.71 0.00 1 1
Shop 2 Block 1 11.68 0.00 1 1
Shop 3 Block 1 28.31 0.00 1 1
Shop 4 Block 1 18.93 0.00 1 1
Shop 5 Block 1 18.98 0.00 1 1
Shop 6 Block 1 18.97 0.00 1 1
Shop 7 Block 1 11.68 0.00 1 1
Shop 8 Block 1 11.70 0.00 1 1
Shop 9 Block 1 28.33 0.00 1 1
Shop E1 Block 1 65.61 0.00 1 1
Shop E2 Block 1 10.60 0.00 1 1
Total 16 15 0
III. Number of parkings allotted
Type Total No. of Car parking Total No. of Two Wheeler parking Total No. of cycle parking Total No of Mechanical Car Parking Total No. of parking allocated at the time of registration or by the end of last quarter Cumulative No. of parking allocated by the end of current quarter
Location Car Two Wheelers Car Two Wheelers
Open Area
Stilt Area
Basement Floor
Any Other Floor
Total
IV. Status of the Project Construction/Development
Part 1: Architectural Progress as per Form R1 issued as at the end of current Quarter ( October to December, 2023 )

TABLE - A

Building Name: Block P
S.No. Task/Activity Percentage of work done
In Last Quarter In Current Quarter
1 Excavation 100 100.00
2 1 Number of Basement(s) and Plinth 100 100.00
3 1 Number of Stilt Floor 100 100.00
4 13 Number of Slabs of Super Structure 100 100.00
5 Internal walls,Internal Plaster,Floorings with in Flats/Premises,Doors and Windows to each of the Flat/Permises 100 100.00
6 Sanitary Fittings with in the Flat/Presmises,Electrical Fittings with in the Flat/Presmises 93 100.00
7 Staircases, Lifts wells and Lobbies at each Floor level connecting Staircases and Lifts,Overhead and Underground Water Tanks 100 100.00
8 The External Plumbing and External Plaster, Elevation, Completion of terraces with waterproofing of the Building/Wing 100 100.00
9 Installation of lifts,Water pumps, Fire Flighting Fittings and Equipment as per CFO NOC, Electrical Fittings to Common Areas,electro,Mechanical equipment, Compliance to conditions of environment / CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to obtain Occupation/Completion Certificate 88 100.00
IV. Status of the Project Construction/Development
Part 1: Architectural Progress as per Form R1 issued as at the end of current Quarter ( October to December, 2023 )
Building Name: Block P1
S.No. Task/Activity Percentage of work done
In Last Quarter In Current Quarter
1 Excavation 100 100.00
2 1 Number of Basement(s) and Plinth 100 100.00
3 1 Number of Stilt Floor 100 100.00
4 13 Number of Slabs of Super Structure 100 100.00
5 Internal walls,Internal Plaster,Floorings with in Flats/Premises,Doors and Windows to each of the Flat/Permises 100 100.00
6 Sanitary Fittings with in the Flat/Presmises,Electrical Fittings with in the Flat/Presmises 93 100.00
7 Staircases, Lifts wells and Lobbies at each Floor level connecting Staircases and Lifts,Overhead and Underground Water Tanks 100 100.00
8 The External Plumbing and External Plaster, Elevation, Completion of terraces with waterproofing of the Building/Wing 100 100.00
9 Installation of lifts,Water pumps, Fire Flighting Fittings and Equipment as per CFO NOC, Electrical Fittings to Common Areas,electro,Mechanical equipment, Compliance to conditions of environment / CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to obtain Occupation/Completion Certificate 88 100.00
IV. Status of the Project Construction/Development
Part 1: Architectural Progress as per Form R1 issued as at the end of current Quarter ( October to December, 2023 )
Building Name: Block S
S.No. Task/Activity Percentage of work done
In Last Quarter In Current Quarter
1 Excavation 100 100.00
2 1 Number of Basement(s) and Plinth 100 100.00
3 1 Number of Stilt Floor 100 100.00
4 13 Number of Slabs of Super Structure 100 100.00
5 Internal walls,Internal Plaster,Floorings with in Flats/Premises,Doors and Windows to each of the Flat/Permises 100 100.00
6 Sanitary Fittings with in the Flat/Presmises,Electrical Fittings with in the Flat/Presmises 93 100.00
7 Staircases, Lifts wells and Lobbies at each Floor level connecting Staircases and Lifts,Overhead and Underground Water Tanks 100 100.00
8 The External Plumbing and External Plaster, Elevation, Completion of terraces with waterproofing of the Building/Wing 100 100.00
9 Installation of lifts,Water pumps, Fire Flighting Fittings and Equipment as per CFO NOC, Electrical Fittings to Common Areas,electro,Mechanical equipment, Compliance to conditions of environment / CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to obtain Occupation/Completion Certificate 88 100.00
IV. Status of the Project Construction/Development
Part 1: Architectural Progress as per Form R1 issued as at the end of current Quarter ( October to December, 2023 )
Building Name: Block S1
S.No. Task/Activity Percentage of work done
In Last Quarter In Current Quarter
1 Excavation 100 100.00
2 1 Number of Basement(s) and Plinth 100 100.00
3 1 Number of Stilt Floor 100 100.00
4 13 Number of Slabs of Super Structure 100 100.00
5 Internal walls,Internal Plaster,Floorings with in Flats/Premises,Doors and Windows to each of the Flat/Permises 100 100.00
6 Sanitary Fittings with in the Flat/Presmises,Electrical Fittings with in the Flat/Presmises 93 100.00
7 Staircases, Lifts wells and Lobbies at each Floor level connecting Staircases and Lifts,Overhead and Underground Water Tanks 100 100.00
8 The External Plumbing and External Plaster, Elevation, Completion of terraces with waterproofing of the Building/Wing 100 100.00
9 Installation of lifts,Water pumps, Fire Flighting Fittings and Equipment as per CFO NOC, Electrical Fittings to Common Areas,electro,Mechanical equipment, Compliance to conditions of environment / CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to obtain Occupation/Completion Certificate 88 100.00
IV. Status of the Project Construction/Development
Part 1: Architectural Progress as per Form R1 issued as at the end of current Quarter ( October to December, 2023 )
Building Name: Block S2
S.No. Task/Activity Percentage of work done
In Last Quarter In Current Quarter
1 Excavation 100 100.00
2 1 Number of Basement(s) and Plinth 100 100.00
3 1 Number of Stilt Floor 100 100.00
4 13 Number of Slabs of Super Structure 100 100.00
5 Internal walls,Internal Plaster,Floorings with in Flats/Premises,Doors and Windows to each of the Flat/Permises 100 100.00
6 Sanitary Fittings with in the Flat/Presmises,Electrical Fittings with in the Flat/Presmises 93 100.00
7 Staircases, Lifts wells and Lobbies at each Floor level connecting Staircases and Lifts,Overhead and Underground Water Tanks 100 100.00
8 The External Plumbing and External Plaster, Elevation, Completion of terraces with waterproofing of the Building/Wing 100 100.00
9 Installation of lifts,Water pumps, Fire Flighting Fittings and Equipment as per CFO NOC, Electrical Fittings to Common Areas,electro,Mechanical equipment, Compliance to conditions of environment / CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to obtain Occupation/Completion Certificate 88 100.00
IV. Status of the Project Construction/Development
Part 1: Architectural Progress as per Form R1 issued as at the end of current Quarter ( October to December, 2023 )
Building Name: Block S3
S.No. Task/Activity Percentage of work done
In Last Quarter In Current Quarter
1 Excavation 100 100.00
2 1 Number of Basement(s) and Plinth 100 100.00
3 1 Number of Stilt Floor 100 100.00
4 13 Number of Slabs of Super Structure 100 100.00
5 Internal walls,Internal Plaster,Floorings with in Flats/Premises,Doors and Windows to each of the Flat/Permises 100 100.00
6 Sanitary Fittings with in the Flat/Presmises,Electrical Fittings with in the Flat/Presmises 93 100.00
7 Staircases, Lifts wells and Lobbies at each Floor level connecting Staircases and Lifts,Overhead and Underground Water Tanks 100 100.00
8 The External Plumbing and External Plaster, Elevation, Completion of terraces with waterproofing of the Building/Wing 100 100.00
9 Installation of lifts,Water pumps, Fire Flighting Fittings and Equipment as per CFO NOC, Electrical Fittings to Common Areas,electro,Mechanical equipment, Compliance to conditions of environment / CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to obtain Occupation/Completion Certificate 88 100.00
IV. Status of the Project Construction/Development
Part 1: Architectural Progress as per Form R1 issued as at the end of current Quarter ( October to December, 2023 )
Building Name: Block T
S.No. Task/Activity Percentage of work done
In Last Quarter In Current Quarter
1 Excavation 100 100.00
2 0 Number of Basement(s) and Plinth 100 100.00
3 0 Number of Stilt Floor 100 100.00
4 0 Number of Slabs of Super Structure 100 100.00
5 Internal walls,Internal Plaster,Floorings with in Flats/Premises,Doors and Windows to each of the Flat/Permises 100 100.00
6 Sanitary Fittings with in the Flat/Presmises,Electrical Fittings with in the Flat/Presmises 93 100.00
7 Staircases, Lifts wells and Lobbies at each Floor level connecting Staircases and Lifts,Overhead and Underground Water Tanks 100 100.00
8 The External Plumbing and External Plaster, Elevation, Completion of terraces with waterproofing of the Building/Wing 100 100.00
9 Installation of lifts,Water pumps, Fire Flighting Fittings and Equipment as per CFO NOC, Electrical Fittings to Common Areas,electro,Mechanical equipment, Compliance to conditions of environment / CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to obtain Occupation/Completion Certificate 88 100.00

TABLE - B

Internal and External Development Works for the entire registered Phase/Project

S.No. Common areas and Facilities/Amenities Proposed Yes/No Percentage of work done Details if any
By the end of Last Quarter By the end of Current Quarter
1 Internal Roads & Footpaths 52 100
2 Water Supply 98 100
3 Sewerage (chamber, lines, Septic Tank STP) 97 100
4 Storm Water Drainss 97 100
5 Landscaping & Tree Planting 43 100
6 Street Lighting 76 100
7 Community Building 100 100
8 Treatment and disposal of sewage and sullage water 100 100
9 Solid Waste management & Disposal 0 0
10 Water conservation, Rain water harvesting 100 100
11 Energy management 0 0
12 Fire protection and fire safety requirements 92 100
13 Electrical meter room, sub-station, receiving station 62 100
Form R1: Date of issue
16/01/2024
Part 2: Engineering Progress as per Form R2 issued as at the end of current Quarter ( October to December, 2023 )

TABLE - A

Building Name : Block P
S.No. Task/Activity Percentage of work done
By the end of Last Quarter By the end of Current Quarter
1 Total Estimated cost of the building 128,009,128.00 128,009,128.00
2 Cost incurred against the estimated cost 118,503,363.00 126,985,055.00
3 Work done (as Percentage of the estimated cost) % 93 99.00
4 Balance Cost to be Incurred (Bases on Estimated Cost) 9,505,765.00 1,024,073.00
5 Cost Incurred on Additional/Extra Items not included in the Estimated Cost 0.00 0.00
Part 2: Engineering Progress as per Form R2 issued as at the end of current Quarter ( October to December, 2023 )
Building Name : Block P1
S.No. Task/Activity Percentage of work done
By the end of Last Quarter By the end of Current Quarter
1 Total Estimated cost of the building 114,603,266.00 114,603,266.00
2 Cost incurred against the estimated cost 106,551,223.00 113,560,376.00
3 Work done (as Percentage of the estimated cost) % 93 99.00
4 Balance Cost to be Incurred (Bases on Estimated Cost) 8,052,043.00 1,042,890.00
5 Cost Incurred on Additional/Extra Items not included in the Estimated Cost 0.00 0.00
Part 2: Engineering Progress as per Form R2 issued as at the end of current Quarter ( October to December, 2023 )
Building Name : Block S
S.No. Task/Activity Percentage of work done
By the end of Last Quarter By the end of Current Quarter
1 Total Estimated cost of the building 101,666,712.00 101,666,712.00
2 Cost incurred against the estimated cost 96,745,031.00 101,158,379.00
3 Work done (as Percentage of the estimated cost) % 95 100.00
4 Balance Cost to be Incurred (Bases on Estimated Cost) 4,921,681.00 508,333.00
5 Cost Incurred on Additional/Extra Items not included in the Estimated Cost 0.00 0.00
Part 2: Engineering Progress as per Form R2 issued as at the end of current Quarter ( October to December, 2023 )
Building Name : Block S1
S.No. Task/Activity Percentage of work done
By the end of Last Quarter By the end of Current Quarter
1 Total Estimated cost of the building 86,849,350.00 86,849,349.60
2 Cost incurred against the estimated cost 81,724,385.00 86,484,582.00
3 Work done (as Percentage of the estimated cost) % 94 100.00
4 Balance Cost to be Incurred (Bases on Estimated Cost) 5,124,965.00 364,767.59
5 Cost Incurred on Additional/Extra Items not included in the Estimated Cost 0.00 0.00
Part 2: Engineering Progress as per Form R2 issued as at the end of current Quarter ( October to December, 2023 )
Building Name : Block S2
S.No. Task/Activity Percentage of work done
By the end of Last Quarter By the end of Current Quarter
1 Total Estimated cost of the building 86,849,350.00 86,849,349.60
2 Cost incurred against the estimated cost 81,275,173.00 86,145,870.00
3 Work done (as Percentage of the estimated cost) % 94 99.00
4 Balance Cost to be Incurred (Bases on Estimated Cost) 5,574,176.00 703,479.59
5 Cost Incurred on Additional/Extra Items not included in the Estimated Cost 0.00 0.00
Part 2: Engineering Progress as per Form R2 issued as at the end of current Quarter ( October to December, 2023 )
Building Name : Block S3
S.No. Task/Activity Percentage of work done
By the end of Last Quarter By the end of Current Quarter
1 Total Estimated cost of the building 101,666,712.00 101,666,712.00
2 Cost incurred against the estimated cost 94,892,612.00 101,524,379.00
3 Work done (as Percentage of the estimated cost) % 93 100.00
4 Balance Cost to be Incurred (Bases on Estimated Cost) 6,774,100.00 142,333.00
5 Cost Incurred on Additional/Extra Items not included in the Estimated Cost 0.00 0.00
Part 2: Engineering Progress as per Form R2 issued as at the end of current Quarter ( October to December, 2023 )
Building Name : Block T
S.No. Task/Activity Percentage of work done
By the end of Last Quarter By the end of Current Quarter
1 Total Estimated cost of the building 15,212,082.00 15,212,082.10
2 Cost incurred against the estimated cost 14,596,972.00 14,596,972.00
3 Work done (as Percentage of the estimated cost) % 96 96.00
4 Balance Cost to be Incurred (Bases on Estimated Cost) 615,110.00 615,110.09
5 Cost Incurred on Additional/Extra Items not included in the Estimated Cost 0.00 0.00

TABLE - B

Internal and External Development Works for the entire registered Phase/Project

S.No. Particulars By the end of Last Quarter By the end of Current Quarter
1 Total Estimated cost of the Internal and External Development Works including amenities and Facilities 136,040,700.00 141,998,248.00
2 Cost incurred against the estimated cost 123,779,063.00 141,995,609.00
3 Work done in Percentage (as Percentage of the estimated Cost) % 91.00 100.00
4 Balanced Cost to be Incurred (Based on Estimated Cost) 12,261,637.00 2,639.00
5 Cost Incurred on Additional/Extra Items not included in the Estimated Cost 0.00 0.00

Summary of Table A and Table B

S.No. Particulars In Last Quarter In Current Quarter
1. Total Estimated Construction Cost
2. Total Cost Incurred on Construction
3. Percentage of Cost Incurred %
Form R2: Date of issue
31/12/2023
Part 3: Financial Progress as per Form R3 issued as at the end of current Quarter ( October to December, 2023 )
Incurred Amount
S.No.. Particulars Estimated Amount
(as per online details)
By the end of Last Quarter By the end of Current Quarter
1 A. Land Cost 227,217,575.00 227,273,524.00 227,273,524.00
B. Development Cost/Cost of Construction 857,659,874.00 865,012,325.00 900,132,950.00
C. Total project cost(A+B)
In Last Quarter In Current Quarter
2S.No. Percentage of total cost incurred on land %
3 Percentage of total cost incurred on development %
4 Percentage Completion of construction work (as per Project Engineer's Certificate, R-2) %
5 Percentage of the Cost incurred on Land Cost to the Total Estimated Cost %
6 Percentage of the Cost incurred on Construction Cost to the Total Estimated Cost %
7 Amount Which can be withdrawn from the separate Account 1,092,285,849.00 1,127,406,474.00
8 Less: Amount withdrawn till date of this certificate as per books of accounts and Bank Statements 878,446,687.00 936,803,023.00
9 Net Amount Which can be withdrawn from the Separate bank account under this certificate 213,839,162.00 190,603,451.00
Form R3: Date of issue
24/01/2024
Certificate showing no linen or charge on the RERA retention Account :
Part 4: Stage wise Time Schedule of completion or Milestones of Construction (as provided in the allotment letter / Agreement for Sale as per the requirements of Section 11(3)(b) of the RERA Act)
No Record Added
V. Project Common Area Details- Development Work For Whole Project
S. No. Common Area And Facilities, Amenities Proposed Percentage Of Completion (%) Drawings uploaded in online Project details or not If no, Planned date of uploading of these drawings
1 Water Supply 100
2 Rain Water Harvesting/ Recharging 100
3 Sanitation(Storm Water Drainage, Sewerage, STP, Solid Water Disposal etc) 100
4 Electrification(Transformer, Solar Energy etc) 100
5 Fire Fighting Provision 100
6 Others 0
VI. Status of Approvals
A Noc's/Permission Present Status
1



2



3



4



5
B. Revision of Building Plans
1 Date of approval of latest Building Plans already uploaded on RERA web portal 29/11/2021
2 Has there been any further Modification, Amendment or Revision, if any, issued by the competent authority with regard to the building plans already uploaded?
VII. Compliances Under the Act
1.
Insurance for the Project
Status
Under section 16 of the RERA Act, it is mandatory for the promoter to obtain insurance in respect of (i) title of the land and building as a part of the Real Estate Project and (ii) construction of the Real Estate Project.
Has the insurance been obtained?
• Planned date of Insurance 31/12/2024

VIII. Details of Real Estate Agents (if any) engaged for the Project

Has any real estate agents been engaged for the Project?     

IX. Miscellaneous

1. Is there any change in promoter profile which is not yet updated in online promoter profile?
2. Is there any change in project details which is not yet updated in online project profile?
3. Has the Completion Certificate been obtained?
• Date of completion certificate.
26/12/2023
• Has the Completion certificate been uploaded on RERA web portal?
4. Has the Occupancy Certificate also been obtained?
• Date of occupancy Certificate.
26/12/2023
• Has the Occupancy certificate been uploaded on RERA web portal?

Allottee Details

Building : Block P (Apartment : 3BHK+Store, Block : Block 1, Carpet Area : 113.17 sq. meters) Number Of Apartments: 52,Booked: 52
Sr.No. Unit/Flat Detail Booking Status Allottee Name
1 . T2-13111 Sold Mrs. Vibha Kapoor , Rakesh Kapoor & Tarun Kapoor
2 . T2-13109 Sold Mr. Rahul Nimawat
3 . T2-4112 Sold Mrs. Jaya Devi Lalwani
4 . T2-13110 Sold Mrs. Soniya Nimawat and Mr. Rahul Nimawat
5 . T2-12110 Sold Mrs. Kavita Udawat
6 . T2-9111 Sold Mr. Girish Tiwari
7 . T2-12111 Sold Mr. Manoj Kumar Sabharwal
8 . T2-9109 Sold Mrs. Sony Akhouri , Anoushka Akhouri & Abhilasha Akhouri
9 . T2-11112 Sold Mr. Prakhar Sharma , Vishnu Datt Sharma & Pratima Sharma
10 . T2-9110 Sold Mr. Akhouri Bishwadeep & Abhilasha Akhouri
11 . T2-8110 Sold Mrs. Neha Gupta
12 . T2-10109 Sold Mr. Ravi Mishra & Tarjani Negi
13 . T2-6109 Sold Mr. Anuj Tandon
14 . T2-11111 Sold Mr. Kuldeep Tak
15 . T2-11109 Sold Mr. Dhirendra Kumar Jha & Sudha Jha
16 . T2-2112 Sold Mr. Prashant Soni & Darpan Sharma
17 . T2-13112 Sold Mr. Gyan Prakash Dwivedi & Dipshi Tak
18 . T2-11110 Sold Mr. Vikas Narayan Kaushik & Uma Kaushik
19 . T2-10110 Sold Mr. Sharad Maheshwari & Apeksha Rathi
20 . T2-8109 Sold Mr. Abhishek Sharma
21 . T2-7111 Sold Mr. Kalpesh Soni
22 . T2-10111 Sold Mr. Dinesh Kumar & Chandramukhi
23 . T2-7109 Sold Mrs. Sangeeta Yadav
24 . T2-9112 Sold Mr. Maneesh Saxena & Rakhi Saxena
25 . T2-7110 Sold Mr. Anirudh Sharma
26 . T2-6110 Sold Mr. Lalan Kumar Singh
27 . T2-4109 Sold Mr. Saurabh Bohara & Shweta Bohara
28 . T2-3111 Sold Mr. Anand Raj Singh & Pratibha Singh
29 . T2-6111 Sold Mrs. Pushpa Jindal
30 . T2-3109 Sold Mrs. Madhu Choudhary & Sudhir Chowdhary
31 . T2-10112 Sold Mr. Lalit Kumar
32 . T2-5112 Sold Mohammad Shafeek
33 . T2-3110 Sold Mr. Mehar Khanna
34 . T2-2110 Sold Mrs. Raman Sharma & Vinay Kumar Sharma
35 . T2-2111 Sold Mr. Abhishek Shukla & Deepti Dwivedi
36 . T2-6112 Sold Mr. Arun Kumar Rao & Esha Rao
37 . T2-1112 Sold Mrs. Sayeeda Sultana & Mohammed Abdus Sattar Naveed
38 . T2-12109 Sold Mr. Nav Pankaj Jain
39 . T2-5111 Sold Mr. Romit Budhwar
40 . T2-8111 Sold Mrs. Suman Kanwar
41 . T2-5109 Sold Mr. Sanjeev Danga & Shanti Devi Danga
42 . T2-12112 Sold Mr. Utsav Sharma
43 . T2-7112 Sold Mrs. Neha Kalwar & Jayant Kumar Kalwar
44 . T2-5110 Sold Mr. Vinay Kumar Sharma & Raman Sharma
45 . T2-4110 Sold Mrs. Ritu Bhargava & Mr. Neeraj Bhargava
46 . T2-2109 Sold Mrs. Mukta Kumari & Mr. Shwetabh Kumar
47 . T2-1111 Sold Mr. Sahil Malik & Aparna Gupta
48 . T2-4111 Sold Mrs. Kiran Golani
49 . T2-1109 Sold Dr. Fatima Sultana & Gulab Nabi
50 . T2-8112 Sold Mrs. Karuna Goyal
51 . T2-1110 Sold Mrs. Vinita Dhariwal
52 . T2-3112 Sold Mrs. Asha Jagatramka & Richa Jagatramka
Building : Block P1 (Apartment : 3BHK+3T, Block : Block 1, Carpet Area : 98.33 sq. meters) Number Of Apartments: 52,Booked: 46
Sr.No. Unit/Flat Detail Booking Status Allottee Name
1 . L2-3107 Sold Mr. Arun Kumar Singh & Richa Singh
2 . L2-7108 Sold Mrs. Pallavi Murarka & Ashim Kumar Sharma
3 . L2-2108 Unsold
4 . L2-12107 Sold Mr. Pramod Bhargava & Preeti Pramod Bhargava
5 . L2-12105 Sold Mr. Goverdhan Kothari
6 . L2-3108 Sold Mrs. Deepa Devi
7 . L2-12106 Sold Mrs. Alka Kumari
8 . L2-11106 Sold Mrs. Neelam Bhati & Kamal Singh Bhati
9 . L2-13105 Sold Mr. Navin Tiwari & Atmika Kaushik
10 . L2-9105 Sold Mr. Pranay Singh
11 . L2-1107 Sold Mrs. Jaya Jain
12 . L2-5108 Sold Mr. Ajay Kumar Mehalwal
13 . L2-13106 Unsold
14 . L2-11105 Sold Mrs. Asha Mathur
15 . L2-10107 Sold Mr. Jagveer Singh Bidawat & Monica Raolot Bidawat
16 . L2-13107 Sold Mrs. Neha Kumari
17 . L2-10105 Sold Mrs. Shambhavi Goswami
18 . L2-1108 Sold Mr. Rahul Baid & Jaya Jain
19 . L2-12108 Sold Mrs. Rekha Anoop Agarwal & Anoop Kumar S Agarwal
20 . L2-10106 Sold Mr. Dhiraj Wanchoo & Suveni Kaul
21 . L2-9106 Sold Mrs. Mithlesh Meena
22 . L2-7105 Sold Ms. Vibha Tomar
23 . L2-6107 Sold Mrs. Meena
24 . L2-9107 Sold Mrs. Shweta Khanna & Karan Khanna
25 . L2-6105 Sold Mrs. Sunita Sharma
26 . L2-13108 Unsold
27 . L2-8108 Sold Mr. Sandeep
28 . L2-6106 Sold Mrs. Sunita Lakhyani & Amit Kumar Ahuja
29 . L2-5106 Unsold
30 . L2-3105 Unsold
31 . L2-2107 Sold Mrs. Ritu Pasbola & Ashish Pasbola
32 . L2-5107 Sold Mrs. Martha
33 . L2-2105 Sold Mr. Ajay Kumar & Vandana
34 . L2-9108 Sold Mrs. Preeti Athiya & Kumar Raghav Ganesan
35 . L2-4108 Sold Mrs. Deepika Gaur
36 . L2-2106 Sold Mr. Jatin Sangivieya
37 . L2-1106 Sold Mrs. Neha Chaudhary
38 . L2-8107 Sold Mrs. Neelam Bhardwaj
39 . L2-11107 Sold Mr. Amit Sihag
40 . L2-8105 Sold Mr. Sumit Aggarwal
41 . L2-10108 Sold Mrs. Bharti Juyal & Rachit Kumar Girdhar
42 . L2-8106 Sold Mr. Nikhil Kumar Sa & Neha Sa
43 . L2-7106 Unsold
44 . L2-5105 Sold Mr. Rajendra Sharma
45 . L2-4107 Sold Mrs. Mina
46 . L2-7107 Sold Mr. Ashim Kumar Sharma & Pallavi Murarka
47 . L2-4105 Sold cMr. Vaibhav Jain
48 . L2-6108 Sold Mr. Sanjay Singh Bhamboo & Ramniwas
49 . L2-4106 Sold Mr. Sunil Kumar Sharma
50 . L2-3106 Sold Mohd. Ahmed Hussain
51 . L2-1105 Sold Mr. Krishan Kumar Gupta
52 . L2-11108 Sold Mrs. Sonam Gupta
Building : Block S (Apartment : 3BHK+3T, Block : Block 1, Carpet Area : 98.27 sq. meters) Number Of Apartments: 26,Booked: 25
Sr.No. Unit/Flat Detail Booking Status Allottee Name
1 . L3-689 Sold Mr. Shani Pal & Mukesh Devi
2 . L3-1289 Sold Mrs. Astha Choudhary
3 . L3-589 Sold Mr. Rahul Sharma & Krishna Lagria
4 . L3-1090 Sold Mr. Atanu Mukherjee & Neha Mukherjee
5 . L3-590 Sold Mr. Nikhil Jain & Anju C
6 . L3-390 Sold Mrs. Priyanka Rai
7 . L3-489 Sold Mr. Sundeep Jaiman
8 . L3-1290 Sold Mr. Ashish Laxminarayan Maharshi
9 . L3-290 Sold Mrs. Usha Sharma
10 . L3-289 Sold Mr. Udit Gupta
11 . L3-889 Sold Mrs. Ruchi Verma
12 . L3-189 Sold Mr. Jagdish Lal Sharma
13 . L3-690 Sold Mrs. Nidhi Jain
14 . L3-190 Sold Mr. Jagdish Godara
15 . L3-890 Sold Mr. Saurabh Yadav
16 . L3-1189 Sold Mrs. Shalini Sharma & Vipin Mohan Sharma
17 . L3-1089 Sold Mrs. Shabda Pandey
18 . L3-989 Sold Mrs. Aparna Vyas & Himanshu Vyas
19 . L3-990 Sold Mrs. Tarini Kaushik & Shruti Kaushik
20 . L3-790 Sold Mrs. Sudha Kulkarni
21 . L3-389 Sold Mr. Naveen Kumar
22 . L3-490 Sold Mrs. Bhavana Khare
23 . L3-1389 Sold Mrs. Tripti Vashistha
24 . L3-1390 Unsold
25 . L3-1190 Sold Mrs. Priya Shukla & Harsh Jain
26 . L3-789 Sold Mrs. Indu Kaler
Building : Block S (Apartment : 2BHK, Block : Block 1, Carpet Area : 74.24 sq. meters) Number Of Apartments: 26,Booked: 24
Sr.No. Unit/Flat Detail Booking Status Allottee Name
1 . M2-792 Sold Mr. Himanshu Sharda
2 . M2-1091 Sold Mr. Anil Saini
3 . M2-392 Sold Mr. Neeraj Aseri & Deepa Shree Bhatt
4 . M2-1391 Unsold
5 . M2-1291 Sold Mr. Neeraj Sharma
6 . M2-1292 Sold Mrs. Ritika Kulshreshtha
7 . M2-1092 Sold Mrs. Ratan Saini
8 . M2-691 Sold Mr. Soumitra Maheshwari
9 . M2-591 Sold Mr. Sandeep Singh Duggal
10 . M2-1191 Sold Mr. Mukesh Kumar Sharma & Deepali Sharma
11 . M2-491 Sold Mr. Jamshed Qasim Hasan Khan
12 . M2-992 Sold Mr. Aashish Kharbanda
13 . M2-492 Sold Mrs. Nidhee Sharma
14 . M2-292 Sold Mrs. Shruti Mathur
15 . M2-391 Sold Mr. Neeraj Aseri & Deepa Shree Bhatt
16 . M2-1192 Sold Mr. Rajesh Kumar Sharma
17 . M2-192 Sold Mr. Jamshed Qasim Hasan Khan
18 . M2-991 Sold Mrs. Sunistha Singh
19 . M2-891 Sold Kamla Subhramain
20 . M2-1392 Sold Mr. Kapish Gupta
21 . M2-892 Sold Kamala Subhramain
22 . M2-692 Sold Mrs. Preeti Maheshwari
23 . M2-291 Sold Mrs. Simran Kaur
24 . M2-191 Unsold
25 . M2-791 Sold Mrs. Hina Shrivastav
26 . M2-592 Sold Maj. Gaurav Bhardwaj & Isha Bharti Bhardwaj
Building : Block S1 (Apartment : 2BHK, Block : Block 1, Carpet Area : 74.24 sq. meters) Number Of Apartments: 52,Booked: 49
Sr.No. Unit/Flat Detail Booking Status Allottee Name
1 . M2-695 Sold Mr. Mohammad Rizwan
2 . M2-995 Sold Mr. Vishal Uday
3 . M2-693 Sold Mrs. Khushboo Pandita & Peuish Dhar
4 . M2-1396 Sold Mrs. Dimple Kanwar
5 . M2-896 Sold Ms. Isha Jain
6 . M2-694 Sold Mr. Rohit Soni
7 . M2-594 Sold Mr. Aditya Saxena
8 . M2-295 Unsold
9 . M2-595 Sold Mr. Vinod Kumar
10 . M2-293 Sold Mr. Harpal Singh & Harwinder Kaur
11 . M2-996 Sold Ms. Deepali Somra
12 . M2-496 Sold Mrs. Rachna Joshi
13 . M2-294 Sold Mrs. Rama Seth
14 . M2-194 Sold Mrs. Divya Pratap & Bhanu Pratap
15 . M2-393 Sold Mr. Sushant Verma
16 . M2-495 Sold Mrs. Sunita Kumari & Sachin Kumar
17 . M2-795 Sold Mr. Ashutosh Chandra
18 . M2-493 Sold Mrs. Pooja Goyal & Vishal Goyal
19 . M2-1196 Sold Mr. Jagrit Kaushik & Harit Narayan Kaushik
20 . M2-696 Sold Mr. Utkarsh Soni
21 . M2-494 Sold Mrs. Smita Sharma & Amit Sharma
22 . M2-394 Sold Mrs. Nirmala
23 . M2-193 Sold Mr. Shreepal Singh Yadav
24 . M2-395 Sold Mrs. Ritu Mundhara & Ritesh Mundhara
25 . M2-796 Sold Mr. Aditya Chandra
26 . M2-296 Sold Mr. Koshalndra Kumar Sharma
27 . M2-1393 Sold Mr. Rajesh Kumar Mishra
28 . M2-1295 Sold Mr. Deepak Arora
29 . M2-1293 Sold Mr. Saphiq Ahmed
30 . M2-396 Sold Mrs. Ritu Mundhara & Ritesh Mundhara
31 . M2-1294 Sold Mrs. Shalini Sukheeja & Aditi Sukheeja
32 . M2-1194 Sold Mr. Sudhir Kumar
33 . M2-993 Sold Mrs. Neha Sharma
34 . M2-895 Sold Mr. Anil Kumar Jain
35 . M2-1195 Sold Mr. Surbhit Kaushik & Harit Narayan Kaushik
36 . M2-893 Sold Mrs. Pushpa Devi
37 . M2-1096 Sold Mrs. Rakshita Negi
38 . M2-894 Sold Mr. Amit Joshi & Ankita Sharma
39 . M2-794 Sold Mrs. Varsha Joshi
40 . M2-593 Sold Mrs. Rekha & Neeraj Kumar
41 . M2-195 Sold Mr. Gaurav Sharma & Hemlata Sharma
42 . M2-596 Sold Ms. Ritika Pareek
43 . M2-1394 Sold Mrs. Seema Mishra
44 . M2-1193 Sold Mr. Chandan Mishra
45 . M2-1095 Sold Mrs. Garima Tank & Arun Tank
46 . M2-1395 Cancelled
47 . M2-1093 Sold Mrs. Namita Agarwal
48 . M2-1296 Sold Mr. Anita Arora
49 . M2-1094 Sold Mr. Radhey Shyam Sharma
50 . M2-994 Sold Mrs. Kiran Tripathi
51 . M2-793 Sold Mrs. Manisha Yadav & Mayank Yadav
52 . M2-196 Unsold
Building : Block S2 (Apartment : 2BHK, Block : Block 1, Carpet Area : 74.24 sq. meters) Number Of Apartments: 52,Booked: 47
Sr.No. Unit/Flat Detail Booking Status Allottee Name
1 . M2-1297 Sold Mr. Dinesh Kumar Sharma
2 . M2-999 Unsold
3 . M2-1299 Sold Mr. Chirag Makhija & Rashmi Makhija
4 . M2-997 Sold Mr. Vijay Kumar Meena
5 . M2-11100 Sold Mr. Karan Singh Sisodia & Swati Chauhan
6 . M2-998 Sold Mrs. Shanu Khoda
7 . M2-898 Sold Mr. Vikram Singh Rathore & Kavita Shekhawat
8 . M2-897 Sold Mr. Vipin Indora
9 . M2-599 Sold Mrs. Bharti Devi
10 . M2-899 Sold Ms. Reenu Rewani
11 . M2-597 Sold Mr. Aakash
12 . M2-12100 Sold Mrs. Meenakshi Ratra
13 . M2-7100 Sold Mr. Phool Chand
14 . M2-598 Sold Mr. Aakash
15 . M2-498 Sold Mr. Shikhar Johari
16 . M2-297 Sold Mrs. Amrita Chaudhary
17 . M2-1097 Sold Mr. Akshat Sharma
18 . M2-799 Sold Mr. Devendra Singh
19 . M2-1099 Sold Mrs. Sunayana Chaudhary
20 . M2-797 Sold Mr. Sumit Agrawal
21 . M2-9100 Sold Mr. Purushottm & Renu Sharma
22 . M2-798 Sold Mr. Sumit Agrawal
23 . M2-698 Sold Mrs. Nidhi Ranawat
24 . M2-497 Sold Ms. Sabeena Arif
25 . M2-697 Sold Mr. Digvijay Shekhawat
26 . M2-399 Sold Mrs. Manju Lata Sharma
27 . M2-699 Sold Mrs. Anita Lamba & Chandra Prakash
28 . M2-397 Sold Mrs. Garima Sharma & Girish Sharma
29 . M2-10100 Sold Mr. Anirudh Singh Dhillon
30 . M2-5100 Sold Mrs. Rupa Mukherjee & Amit Mukherjee
31 . M2-398 Sold Mr. Rakesh Kumar Niraj & Sangeeta Kumari
32 . M2-298 Sold Mrs. Amrita Chaudhary
33 . M2-299 Unsold
34 . M2-6100 Sold Mrs. Anita Lamba & Chandra Prakash
35 . M2-1100 Unsold
36 . M2-1199 Sold Mr. Abhishek Vyas & Nand Kishore Vyas
37 . M2-1197 Sold Mrs. Ranu Ajay Verma
38 . M2-2100 Sold Mr. Prateek Mehta
39 . M2-13100 Sold Mr. Ajoy Kumar Sodhani
40 . M2-1198 Sold Mrs. Preeti Pareek
41 . M2-1098 Sold Mrs. Raj Jyoti Sharma
42 . M2-199 Unsold
43 . M2-499 Sold Mrs. Rita Sarda
44 . M2-197 Sold Mr. Bishamber Dayal Yadav
45 . M2-8100 Sold Mrs. Apurva Jain
46 . M2-3100 Sold Mrs. Manju Lata Sharma
47 . M2-198 Sold Mr. Sanket Sinha
48 . M2-1399 Unsold
49 . M2-1397 Sold Mrs. Sunita Khetrapal & Karan Khetrapal
50 . M2-1398 Sold Mrs. Sunita Khetrapal & Karan Khetrapal
51 . M2-1298 Sold Mrs. Vaisakhi Dawra
52 . M2-4100 Sold Mrs. Neha Agarwal
Building : Block S3 (Apartment : 2BHK, Block : Block 1, Carpet Area : 74.24 sq. meters) Number Of Apartments: 26,Booked: 21
Sr.No. Unit/Flat Detail Booking Status Allottee Name
1 . M2-6102 Sold Mr. Uttam Dhabas
2 . M2-13102 Sold Mrs. Saba Ahmad
3 . M2-2102 Sold Ms. Akshita Pareek
4 . M2-12101 Sold Mrs. Smriti Sharma
5 . M2-11101 Sold Mrs. Shakunthala Devi & Kushal Sharma
6 . M2-11102 Sold Mrs. Mithlesh Kumari
7 . M2-9102 Sold Mrs. Anisha Meena
8 . M2-9101 Unsold
9 . M2-4101 Sold Mrs. Shilpa Sharma
10 . M2-10101 Sold Mr. Ashim Bhasin & Parul Singh
11 . M2-3101 Sold Mrs. Nidhi Singh
12 . M2-8102 Sold Mrs. Vijay Sharma
13 . M2-3102 Sold Mr. Vivek Singh
14 . M2-1102 Sold Mr. Shailendra Juni
15 . M2-1101 Unsold
16 . M2-2101 Unsold
17 . M2-10102 Sold Mrs. Vishakha
18 . M2-13101 Unsold
19 . M2-8101 Sold Mr. Kailash Chand Sharma
20 . M2-7101 Sold Ms. Komal Murarka
21 . M2-12102 Sold Mr. Pramod Kumar Tanwar
22 . M2-7102 Sold Ms. Komal Murarka
23 . M2-5102 Sold Mr. Pushpendra Kumar & Neeti Athiya
24 . M2-5101 Sold Mr. Ashish kumar
25 . M2-6101 Unsold
26 . M2-4102 Sold Ms. Manisha Bhadoria
Building : Block S3 (Apartment : 3BHK+3T, Block : Block 1, Carpet Area : 98.27 sq. meters) Number Of Apartments: 26,Booked: 23
Sr.No. Unit/Flat Detail Booking Status Allottee Name
1 . L3-11103 Sold Mr. Shrey Suman Golani & Neetu Bhatia
2 . L3-10103 Sold Mr. Vivek Bothra
3 . L3-10104 Sold Mr. Girish Chandra Sharma & Ankit Sharma
4 . L3-8103 Sold Mr. Ashwini Kumar Shukla & Gargi Shukla
5 . L3-3103 Sold Mr. Surjit Singh Banyal & Jyoti Banyal
6 . L3-9103 Sold Mr. Ashim Bhasin
7 . L3-2103 Unsold
8 . L3-7104 Sold Mr. Kalpesh Jain & Rajendra Jain
9 . L3-2104 Sold Mr. Ankur Singh
10 . L3-8104 Sold Mrs. Deepti Sharma
11 . L3-12103 Sold Mrs. Monika Kaswan & Sumit Kumar
12 . L3-7103 Sold Mrs. Mridula Chandranarayan Moondra
13 . L3-13103 Unsold
14 . L3-6103 Sold Mrs. Manaka Bishnoi
15 . L3-11104 Sold Mr. Gaurav Sharma & Mukul Sharma
16 . L3-6104 Sold Mr. Gangeya Upadhyaya
17 . L3-4104 Sold Mr. Rohit Dadheech & Neha Dadheech
18 . L3-4103 Sold Mr. Ved Prakash
19 . L3-5103 Sold Mr. Ved Prakash
20 . L3-3104 Sold Mrs. Neha Chelani
21 . L3-5104 Sold Mr. Subodh Agarwal & Nidhi Garg
22 . L3-13104 Sold Mr. Kapil Chanchlani
23 . L3-12104 Sold Mr. Abhay Lohani & Shailza Lohani
24 . L3-1103 Unsold
25 . L3-9104 Sold Mrs. Geetika Sharma
26 . L3-1104 Sold Mr. Vinay Aswal
Building : Block T (Apartment : Shop 1, Block : Block 1, Carpet Area : 11.68 sq. meters) Number Of Apartments: 1,Booked: 1
Sr.No. Unit/Flat Detail Booking Status Allottee Name
1 . S-01 Sold Mrs. Sheenu Shekhawat
Building : Block T (Apartment : Shop 2, Block : Block 1, Carpet Area : 11.68 sq. meters) Number Of Apartments: 1,Booked: 1
Sr.No. Unit/Flat Detail Booking Status Allottee Name
1 . S-02 Sold Mr. Tariq Hussain Siddiqui
Building : Block T (Apartment : Shop 3, Block : Block 1, Carpet Area : 28.31 sq. meters) Number Of Apartments: 1,Booked: 1
Sr.No. Unit/Flat Detail Booking Status Allottee Name
1 . S-03 Sold Mr. Pawan Nagrath & Khushi Nagrath
Building : Block T (Apartment : Shop 4, Block : Block 1, Carpet Area : 18.93 sq. meters) Number Of Apartments: 1,Booked: 1
Sr.No. Unit/Flat Detail Booking Status Allottee Name
1 . S-04 Sold Mr. Sharad Nagrath & Virendra Pal Nagrath
Building : Block T (Apartment : Shop 5, Block : Block 1, Carpet Area : 18.98 sq. meters) Number Of Apartments: 1,Booked: 1
Sr.No. Unit/Flat Detail Booking Status Allottee Name
1 . S-05 Sold Mrs. Sarika Sharma
Building : Block T (Apartment : Shop 6, Block : Block 1, Carpet Area : 18.97 sq. meters) Number Of Apartments: 1,Booked: 1
Sr.No. Unit/Flat Detail Booking Status Allottee Name
1 . S-06 Sold Mrs. Prerna Palod
Building : Block T (Apartment : Shop E1, Block : Block 1, Carpet Area : 65.61 sq. meters) Number Of Apartments: 1,Booked: 1
Sr.No. Unit/Flat Detail Booking Status Allottee Name
1 . SHOP E1 Sold Mrs. Prerna Palod
Building : Block T (Apartment : Shop E2, Block : Block 1, Carpet Area : 10.60 sq. meters) Number Of Apartments: 1,Booked: 0
Sr.No. Unit/Flat Detail Booking Status Allottee Name
1 . SHOP E2 Unsold
Building : Block T (Apartment : Shop 7, Block : Block 1, Carpet Area : 11.68 sq. meters) Number Of Apartments: 1,Booked: 1
Sr.No. Unit/Flat Detail Booking Status Allottee Name
1 . S-07 Sold Mrs. Manju Kanwar
Building : Block T (Apartment : Shop 8, Block : Block 1, Carpet Area : 11.70 sq. meters) Number Of Apartments: 1,Booked: 1
Sr.No. Unit/Flat Detail Booking Status Allottee Name
1 . S-08 Sold Mr. Surendra Singh
Building : Block T (Apartment : Shop 9, Block : Block 1, Carpet Area : 28.33 sq. meters) Number Of Apartments: 1,Booked: 1
Sr.No. Unit/Flat Detail Booking Status Allottee Name
1 . S-09 Sold Mrs. Chandramukhi & Dinesh Kumar
Building : Block T (Apartment : Shop 10, Block : Block 1, Carpet Area : 18.93 sq. meters) Number Of Apartments: 1,Booked: 1
Sr.No. Unit/Flat Detail Booking Status Allottee Name
1 . S-10 Sold Mr. Gajendra Kumar
Building : Block T (Apartment : Shop 11, Block : Block 1, Carpet Area : 18.98 sq. meters) Number Of Apartments: 1,Booked: 1
Sr.No. Unit/Flat Detail Booking Status Allottee Name
1 . S-11 Sold Mr. Yogesh Sharma & Shalini Sharma
Building : Block T (Apartment : Shop 12, Block : Block 1, Carpet Area : 18.97 sq. meters) Number Of Apartments: 1,Booked: 1
Sr.No. Unit/Flat Detail Booking Status Allottee Name
1 . S-12 Sold Mr. Amit Sethi
Building : Block T (Apartment : Shop 13, Block : Block 1, Carpet Area : 82.13 sq. meters) Number Of Apartments: 1,Booked: 1
Sr.No. Unit/Flat Detail Booking Status Allottee Name
1 . S-13 Sold Ms. Sunita Devi
Building : Block T (Apartment : Shop 14, Block : Block 1, Carpet Area : 51.71 sq. meters) Number Of Apartments: 1,Booked: 0
Sr.No. Unit/Flat Detail Booking Status Allottee Name
1 . S-14 Unsold
Allottee Cancelled Details
Building/ Apartment Type Unit/ Flat Details Allottee Name Amount Received Amount Refunded Mode Of Refund Proof Of Refund
No record found!
Undertaking
I/ we solemnly affirm, declare and undertake that all the details started above are true to the best of my knowledge and nothing material has been concealed there from. I am executing this undertaking to attest to the truth of all the foregoing and to apprise the RERA Authority of such facts as mentioned as well as for whatever other legal purposes this undertaking amy serve.

Payment Details